Quebec Electrical Code
Rule 60-700
Bonding of cable sheath
When aerial or underground cables enter buildings, the metallic sheath or shield of the cable must be bonded to ground as close as practicable to the...
Unlock the Full Rule Analysis
This rule has been fully audited and analyzed. Log in to ask Henri for exact calculations, exceptions, and job-site requirements.
Ask Henri Now🧮
Smart Calculators
Henri uses this rule to automatically calculate wire sizing, voltage drop, and box fill.
🔍
Cross-Referenced
Instantly view how this rule interacts with Utility Manuals and Appendix B.
⚡️
Jobsite Ready
Accessible via mobile with offline caching capabilities for remote locations.