Advanced Service Load

Comprehensive service calculation tool mimicking exact Section 8 demand factors for complex residential structures.

Building Definition

Climate Control (Watts)

Heavy Appliances (Watts)

Additional Fixed Loads

32 Amps
Pro Tip: Space Heating vs AC

Rule 8-106 (Non-coincident loads). Since electric baseboards and air conditioning will not be used simultaneously, you only need to factor the larger of the two into your final service calculation overhead.

Calculated Demand

142Amps

Estimated at 240V 1-Phase

Base Load (Area)8,000 W
HVAC Demand10,000 W
Major Appliances2,375 W
EV Charger7,680 W
Standard Target150 A Panel